Liverpool Regeneration & Investment Briefing

Funding, places and delivery.

Cover of the Q3 2026 edition
Contents of this edition

Funding, places and delivery. A briefing for the organisations bringing forward homes and regeneration across Liverpool, from the docklands to Speke and Norris Green.

Liverpool Town Hall, Castle StreetIllustrative visualisation, AI-generated; adapted from a photograph by Rodhullandemu, CC BY-SA 4.0

Dates and decisions to watch

As at 19 September 2026 Published position
New Liverpool Local Plan Council approved the plan for submission on 20 July 2026 and it has gone to the Planning Inspectorate for independent examination. Minimum 33,552 homes to 2043, 145 site allocations, brownfield-first, focused on North Liverpool, the North Docks, Ten Streets, Pumpfields & Limekilns and Festival Gardens. Examination and adoption dates not published. [7,11]
Liverpool North Docks MDC Formal proposal to the Combined Authority on 25 September 2026; if approved, the Mayor writes to the Secretary of State. Pumpfields and Ten Streets sit inside the proposed area. [8]
Festival Gardens Planning application for phase one (440 homes) expected late 2026; build from spring 2027. [12]
Pride in Place — four neighbourhoods Boards established spring 2026; membership and boundary changes were due to MHCLG by 17 July 2026; ten-year Pride in Place Plans due to MHCLG by 30 November 2026; on approval, £1.36m per neighbourhood is released in financial year 2027/28. [9,24]
Pride in Place Impact Fund £1.5m to Liverpool: £750,000 determined 29 September 2025 and £750,000 determined 8 April 2026. Local distribution not published. [13,14]
LCRCA Brownfield Land Fund Rolling; no standing deadline published. Contact brownfield@liverpoolcityregion-ca.gov.uk. [see regions page]

Figures in this briefing cover different programmes, geographies and periods. They should not be added into a single city investment total.

The funding landscape

Up to £46 billion over ten years

Homes England and its subsidiary, the National Housing Bank, have up to £46 billion to deploy across England to 2036. These are the principal streams. [1]

The joint Investment Prospectus, published on 31 March 2026 ahead of the Bank's opening on 1 April, brings grant, land and finance into one framework. The Bank aims to attract more than £50 billion of additional private capital over the decade. [1]

Stream Amount What it funds / who it reaches
Social and Affordable Homes Programme 2026–2036 At least £27bn outside London; £39bn nationally, including London Capital grant for social and affordable rent, shared ownership, supported housing and estate regeneration. Registered Providers, councils, housebuilders and community-led organisations, through continuous market engagement or strategic partnerships.
Housing and Infrastructure Capital Grant About £3.1bn (Homes England's share of the £5bn national pot*) Land assembly, remediation and strategic infrastructure; dedicated viability-gap support planned for later in 2026/27. Councils, developers and landowners with sites the market cannot unlock alone.
National Housing Delivery Fund (debt, equity and guarantees) Up to £16bn Loans, equity and guarantees, including funding that may be devolved to mayoral authorities. Housebuilders, Registered Providers, funds and lending partners.

*The prospectus describes the agency's share as £3.1bn, subject to final confirmation. These are programme envelopes, not a ring-fenced allocation to Liverpool. [1]

Programme milestones

Date Milestone
31 March / 1 April 2026 Investment Prospectus published / National Housing Bank opens [1]
1 April 2026 Liverpool City Region integrated settlement begins [3]
24 August 2026 MHCLG publishes a regional funding breakdown estimating the Liverpool City Region's first-wave Strategic Partnership spend at £380m / c.3,100 homes — a regional estimate, not a Liverpool award [43]
25 August 2026 First wave: 33 strategic partners outside London; partner table sums to £9,584.1m of grant and 73,617 homes [2]
Later in 2026/27 Dedicated viability-gap grant planned [1]
To 2036 Ten-year programme period

Grant, land and finance (products and routes)

Which support fits a scheme depends less on its size than on what is holding it up: a funding gap, a difficult site, or the tenure of the homes to be delivered. [1]

Family Product Purpose Typical user
Grant Social and Affordable Homes Programme Affordable tenures, supported housing and estate regeneration RPs, councils, developer partners
Grant Housing and Infrastructure Capital Grant Viability gaps, infrastructure, land assembly and remediation Councils, landowners, master developers
Land Homes England land Acquisition, enabling and disposal through sale, lease, development agreement or joint venture Developers of all sizes
Finance SME Accelerator Loan Site finance for smaller builders establishing a track record SME housebuilders
Finance Revolving credit facility Multi-site support alongside commercial lenders Growing builders
Finance Senior and mezzanine debt Project funding for build to rent, later living and brownfield schemes Developers and funds
Finance Corporate lending Balance-sheet finance for growth, including modern methods of construction Housebuilders
Finance Infrastructure loans Long-term finance, up to 15 years, for upfront infrastructure Developers and councils
Finance Low-interest RP loans Unlocking capital investment in social and affordable homes Registered Providers
Finance Equity Minority investment in vehicles typically delivering more than 3,000 homes Funds and partnerships
Finance Guarantees Bonds and loans to reduce institutional financing costs Funds and RPs

Two grant routes in the Liverpool City Region. Land, remediation and infrastructure support is normally expected to come first through the Combined Authority, which has held the integrated settlement since 1 April 2026 and carries housing and strategic planning as one of its six themes. Social and Affordable Homes Programme grant remains administered by Homes England, with the Combined Authority setting published strategic priorities rather than administering the money. The National Housing Bank makes its own finance decisions while working alongside the agency. [1,3]

Regional routes: Liverpool City Region

Regional routes: see regions/liverpool-city-region.md for the Combined Authority, the integrated settlement, the Brownfield Land Fund, the LCR Housing Pipeline and Housing Investment Fund, the Spatial Development Strategy, the Liverpool North Docks Mayoral Development Corporation, the SAHP first-wave regional estimate (MHCLG's published £380m / c.3,100 homes) and regional skills and procurement.

For a Liverpool scheme, the four local routes are these.

Scheme requirement Route for Liverpool What to resolve
Social and affordable homes Homes England SAHP 2026–2036, through strategic partnership or continuous market engagement, shaped by LCRCA's published strategic priorities — North and Central Liverpool are named priority places. [2,10] Eligible tenure against the region's 60% Social Rent floor, delivery partner, grant requirement and programme timing. [10]
Land, infrastructure or abnormal costs Liverpool City Council (Regeneration and Housing directorate) and LCRCA's Brownfield Land Fund; Liverpool City Council is accountable body for the Homes England Brownfield Infrastructure and Land grant at Central Docks. [4,22] Why the site cannot proceed, what intervention unlocks it, and whether the site is already in the LCR Housing Pipeline.
Additional affordable-housing support LCRCA Housing Investment Fund and the LCRCA–Homes England Strategic Place Partnership. SAHP should be secured or actively progressing; explain the remaining gap and deliverability.
Debt, equity or guarantees National Housing Bank via Homes England. [1] Borrower or investment structure, commercial funding, security and the route to repayment.

Nearly 31,000 of the 64,044 homes in the LCR Housing Pipeline published in January 2026 sit in Liverpool — close to half the regional pipeline in one of six boroughs. If a site is not on that pipeline, getting it onto it is usually the first practical step. [5]

Who decides what (decisions and public contacts)

  1. Homes England / National Housing Bank — Final SAHP funding and contractual decisions; the Bank assesses its finance investments; Homes England is also a direct funder at Central Docks and a co-producer of the North Docks masterplan. [1,6]
  2. Liverpool City Region Combined Authority — Regional priorities and tenure mix, Brownfield Land Fund, Housing Investment Fund, the LCR Housing Pipeline, the Spatial Development Strategy and the proposed North Docks Mayoral Development Corporation. [5]
  3. Liverpool City Council — Local housing need, planning and the Local Plan, council land, the Pumpfields and Limekilns SPD, accountable body for Pride in Place and for the Central Docks grant. [4,6,7]
  4. Liverpool North Docks MDC (proposed) — If established, would take major development proposals in the North Docks area as local planning authority. A formal proposal was due at the Combined Authority on 25 September 2026. [8]
  5. Neighbourhood boards — Four Pride in Place boards (Everton East, Fairfield West & Newsham Park, Norris Green East, Speke East) shape local ten-year plans; council accountability and national programme rules still apply. [9]
  6. Scheme owner and delivery team — The RP, council, master developer or JV assembles the scheme. At Liverpool Waters that is Peel Waters; at Festival Gardens the Urban Splash / igloo joint venture. Establish the actual commissioning organisation before approaching anyone.

A useful first enquiry names the site, landowner, proposed use, delivery lead, funding gap and next decision.

Accessing programme grant: a route for smaller providers

  • Continuous Market Engagement — Open for individual schemes and portfolios while funding remains available. Designed to accommodate smaller partners, new entrants and complex projects. [19]
  • Strategic partnerships — Programme-level allocations. Separate guidance applies; the first wave was confirmed on 25 August 2026. [2,20]
Route Practical fit and requirements
CME general A direct scheme bid. Establish eligible tenure, costs, delivery readiness and grant need with Homes England. [18,19]
CME portfolio Initial portfolios normally deliver 300–500 homes; named sites should start by 31 March 2028 and complete by 31 March 2032. [19]
Delivery partnership An eligible RP or council can work with a strategic partner under the programme's delivery-partner rules. [18,20]

Before a grant application

Organisations need Homes England Investment Partner qualification to receive grant. [18] The Liverpool City Region asks Homes England to prioritise at least 60% Social Rent, Modern Methods of Construction, the Future Homes Standard, and homes for older people and wheelchair users; North and Central Liverpool are two of the region's 13 named priority places. [10] Liverpool's own emerging Local Plan seeks 20% affordable housing, half of it social rent. [7]

Festival Gardens, Otterspool, on the south Liverpool riversideIllustrative visualisation, AI-generated; adapted from a photograph by Raymond Knapman, CC BY-SA 2.0

Places and programmes (the four largest live housing-led programmes)

Liverpool's pipeline is concentrated in a small number of very large, long-horizon programmes, all of them brownfield and all of them named in the new Local Plan. Nearly 31,000 of the 64,044 homes in the Combined Authority's January 2026 LCR Housing Pipeline are in Liverpool. [5,7]

1 · Liverpool Waters, Central Docks — up to 2,350 homes, infrastructure on site

The largest of the five Liverpool Waters neighbourhoods, a 26-acre site (10 hectares of infilled former dock in the subsidy papers) on the northern waterfront held by Peel Waters under the wider Liverpool Waters outline permission. Outline consent covers up to 2,350 homes plus commercial, leisure and retail — confirmed on Peel Waters' own portfolio page and in the CMA subsidy referral, across affordable, build-to-rent, build-to-sell and older people's tenures. [15,37,42]

Enabling works £81.1m infrastructure and park package; £71m civils contract with GRAHAM [15]
Funding £55.28m Homes England grant — the exact figure from the CMA's subsidy-control referral, made to Liverpool Waters Finance Limited and Peel L&P Developments Limited, available November 2024 to March 2027, for site-wide groundworks and remediation, raising site levels against flood risk, highways and the new Central Park — plus £25.9m Peel Waters direct investment; Liverpool City Council is the accountable body for the grant [15,37]
Start / completion Works began autumn 2025; infrastructure and the 5-acre Central Park due to complete late spring 2028 [15]
Homes Delivered in phases after the infrastructure, mixed tenure: affordable, older people's housing, build to rent and open market [15]
Planning Liverpool City Council now; the proposed North Docks MDC would take major applications if established [8]

What this means for a supplier or delivery partner: the civils are let. The residential plots come to market in phases from 2027–28 onward, and the counterparty on each is Peel Waters or its plot partner, not the council.

2 · Pumpfields & Limekilns, with Ten Streets — around 7,000 homes

The biggest housing number in the city. A residential-led masterplan on brownfield land on the northern edge of the city centre. The council reports the area as around 75 acres in its own announcement, and press coverage of the adopted document describes about 100 acres; treat the precise area as not verified. Either way it is one of the largest single-authority brownfield regeneration areas in the North West. [16,17]

Stage Position
Cabinet Masterplan approved for consultation, 24 February 2026 [16]
Adoption Pumpfields & Limekilns SPD adopted 2 June 2026, alongside a new Housing Design Guide SPD [17]
Scale Around 7,000 homes over roughly 15–20 years, in six character areas, with employment space, health and leisure facilities and new public realm [16,17]
Governance Inside the proposed North Docks Mayoral Development Corporation area; the MDC's strategic masterplan will incorporate the Pumpfields SPD and the Ten Streets area [8]
Live schemes Individual consents are coming forward now — for example a 160-unit, ten-storey scheme by Rosmara Development Group between Oriel Street and Paul Street fronting Vauxhall Road; start on site reported as early 2026, not verified as commenced [18]

Ten Streets is the adjoining creative and industrial quarter north of the city centre. It is being folded into the North Docks / Pumpfields strategic masterplan rather than run as a separate housing programme, and is named as one of the Local Plan's five regeneration focus areas. Its own housing number is not separately published. [7,8]

3 · Festival Gardens — up to 800 homes, remediated and partnered

The council's own flagship site on the south Liverpool riverside: an 89-acre former International Garden Festival site of which a 27-acre development zone is being brought forward for housing, with a 37-acre park alongside. Remediation was completed by VINCI in summer 2023 at a cost of about £53m, with more than 95% of excavated material recycled. This is a serviced, de-risked site in council ownership. [12]

Development partner Joint venture of Urban Splash and igloo Regeneration, selected after a procurement process; shortlist included Muse, Vistry and CERT Property [12]
Sub-developers Alpha Living (extra care), Regenda Group (affordable and social rent), TOWN with Starship (co-housing and modern methods of construction), plus the Urban Splash Residential Fund, Urban Splash and igloo on other elements [12,38]
Phase one 440 homes, including 80 extra care and 110 affordable — above the council's 20% policy target. Confirmed on Urban Splash's own site as well as the council's. [12,38]
All phases Up to 800 homes across three phases, 34 house types [12,38]
Next steps Planning application for phase one expected late 2026; construction from spring 2027 [12,38]

Cabinet was asked to approve the development agreement in September 2025. Whether that agreement has since been executed is not verified against a published decision record. [12]

4 · The council's own housing delivery — small sites and empty homes

Alongside the three master-planned programmes, the council is running a deliberately small-scale, fast-turnaround programme on its own land and stock. Cabinet considered both strands on 24 February 2026. [19]

Strand Content
Small sites A review of council-owned land identified small, vacant or derelict plots with the potential for up to 400 affordable homes over two to three years, including recovered sites at Ducie Street, Jermyn Street and Rosebery Street in Liverpool 8. Homes are aimed at care leavers, people in temporary accommodation and adults needing supported housing. [19]
Empty homes 52 long-term vacant properties brought back into use across Arundel, Dingle, Edge Hill, Everton North, Everton West, Kensington & Fairfield, Princes Park, Toxteth and Yew Tree wards. 15 for short-term housing need, the remainder for family housing in owner-occupation or private rental. Use as HMOs, student accommodation or short-term lets is excluded. [19]

This is the strand most accessible to smaller contractors and to RPs without a city-centre land position: plot sizes are small, the landowner is the council, and the tenure is affordable by design.

Other live programmes

Anfield. The long-running £260m Anfield and Everton regeneration partnership between Liverpool City Council, Liverpool FC and Your Housing Group reports around 600 new homes and 600 refurbished homes delivered to date, with a new school, shops and the stadium expansion. The current live item is Anfield Square, a 2.5-acre council-owned site off Walton Breck Road immediately west of the stadium, cleared of around 150 terraced houses in 2016. The council acquired Your Housing Group's remaining land interests — 18 leasehold and freehold titles — for £381,000 so it can market the site with clean title, after failing to agree a business case with YHG and declining a hotel proposal from the football club. [20]

Anfield Square is not a housing site, and that is why no homes number exists. The council's Anfield Spatial Regeneration Framework identifies it as a development opportunity for a mix of uses, and the council's published intention is a "best-in-class development comprising a mix of leisure, entertainment, and employment uses", with the long-term vision described as leisure and entertainment including food and beverage relevant to both community and stadium needs, plus short-term "meanwhile" activation. JLL, LDA Design and SPACED were appointed in January 2023 to write the development brief, with JLL running soft market testing and public engagement and a development partner to be selected later through a disposal process. Treat Anfield Square as a commercial and leisure disposal, not a residential pipeline site; the £260m programme totals and the £381,000 land acquisition still rest on sector press rather than a committee report. [20,39,40]

A residential street in Norris Green, LiverpoolIllustrative visualisation, AI-generated; adapted from a photograph by Rept0n1x, CC BY-SA 3.0

Pride in Place: four neighbourhoods, four boards

Liverpool has four Pride in Place neighbourhoods, each with up to £20m over ten years and a resident-led Neighbourhood Board that decides how the money is spent. The council is the accountable body and provides secretariat support. [9,21,22]

Neighbourhood Published position
Speke East Chair Reverend Philip Saltmarsh, Rector of St Aidan's with All Saints, announced 14 April 2026. Maria Eagle MP (Liverpool Garston) sits alongside the Chair. Board member applications closed 25 May 2026. [21]
Norris Green East Chair Ann-Marie Ferrigan, teacher and community leader at Monksdown School, announced 19 May 2026. Board member applications closed 7 June 2026; listening events under way. [22]
Everton East Independent Board Chair recruited through a council advert posted 12 April 2026; the vacancy has since closed. No appointment has been announced. Chair not verified as at 19 September 2026. [23]
Fairfield West and Newsham Park Independent Board Chair recruited through a council advert posted 18 March 2026 and closed 7 April 2026 — an unpaid volunteer role, appointed by the council in partnership with the local MP, requiring residence or employment in the area. No appointment has been announced. Chair not verified as at 19 September 2026. [9,41]

The council's own Pride in Place pages do not name any chair: they set out only that "each board is led by an independent chair, appointed by Liverpool City Council in partnership with the local MP for the area", and that the Chair then leads the recruitment of the Board. The two chairs named above (Speke East, Norris Green East) were announced through Liverpool Express rather than the council's Pride in Place section. [9,21,22]

The timetable that matters

Stage Date
Independent chairs recruited and appointed March 2026 onward [9]
Neighbourhood Boards established Spring 2026 [9]
Boards confirm membership and submit any boundary change to MHCLG 17 July 2026 — the deadline in the national delivery guidance for phase 2 places other than Wales and those named on 20 March 2026 [24]
Boards submit ten-year Pride in Place Plans to MHCLG for assessment and approval 30 November 2026 — the deadline for the 160 phase 2 Neighbourhood Boards, which include Liverpool's four [24]
Plan approved; next payment of £1.36m released, annual payments thereafter Financial year 2027/28 [24]

Until plans are approved, there is no open project call: money in 2026 is capacity and delivery set-up funding, not project funding. The published phase 2 profile is £150,000 of early revenue funding per neighbourhood in 2025/26 to establish the board, then in 2026/27 £135,000 revenue and £117,604 capital per area, with a second revenue payment of £138,462 on approval of the Chair, board membership and any boundary change. [24] A reported £450,000 of capacity funding to Liverpool in January 2026 comes from press coverage, does not match the per-neighbourhood profile above, and is not verified against a council report.

Bring a project that can be delivered

  • Need, ownership and consent — Who benefits, land control, delivery lead, consents and dependencies.
  • Capital and continuing costs — Works, contingency, asset owner, operating budget and maintenance.

National guidance requires boards of at least eight members with at least 51% living or working locally, and sets out what a plan must contain. [24,25]

General enquiries: PrideInPlace@liverpool.gov.uk, with the neighbourhood name in the subject line. [9]

Local investment and project calls: different pots, different decisions

Fund Amount Latest published position
Pride in Place (four neighbourhoods) Up to £20m each over ten years, split 63% capital / 37% revenue for phase 2 Boards forming; plans due to MHCLG by 30 November 2026; £1.36m released on approval in FY 2027/28. [9,21,22,24]
Pride in Place Impact Fund £1.5m £750,000 determined 29 September 2025 and £750,000 determined 8 April 2026, both to Liverpool City Council. No published local distribution or target wards. National guidance requires commitment by 31 March 2027. [13,14,26]
Homes England Brownfield Infrastructure and Land grant £55.2m Central Docks, Liverpool Waters. Liverpool City Council is the accountable body; matched by £25.9m from Peel Waters. Committed, not an open call. [15]
LCRCA Brownfield Land Fund Regional £60m programme, plus £13.8m added November 2025 Rolling applications through the Combined Authority housing team; see the regions page.
LCRCA Housing Investment Fund / £2bn Investment Fund Regional Endorsed January 2026 and announced March 2026; targeted at stalled sites in the LCR Housing Pipeline. See the regions page. [5]
UK Shared Prosperity Fund £52.5m to the Liverpool City Region Regional allocation across Communities and Place, Supporting Local Business, and People and Skills. Liverpool's own share and any successor programme for 2026/27 not verified. [27]
Levelling Up Fund / Town Deals Consolidated by government into a single Local Regeneration Fund capital pot from September 2025. No Liverpool allocation from that pot verified. [27]
Local Neighbourhood Fund The council's own ward-level small grants route, administered through councillors. [28]

There is no single published Liverpool "funding portal". The practical routes are the Combined Authority for land and infrastructure, Homes England for tenure grant, and the council's regeneration and housing teams for council-owned sites.

Stanley Dock and the Tobacco Warehouse, Liverpool North DocksIllustrative visualisation, AI-generated; adapted from a photograph by Rodhullandemu, CC BY-SA 4.0

Homes, partners and local need

Liverpool's Housing Strategy 2025–2030 and its High Level Delivery Plan were published on 20 January 2025. They replace the previous strategy and were consulted on through 2024. [29]

Measure Published figure
New homes commitment 2,000 a year, at least 8,000 by 2027 [30]
Affordable share sought 20% of new build, up from 11% achieved over the previous five years [30]
Local Plan requirement Minimum 33,552 homes to 2043, about 1,974 a year [11]
Local Plan affordable policy 20% affordable on qualifying sites, half of it social rent (press-reported; policy wording not verified) [7]
Homes built, previous five years 10,700, of which 11% affordable [30]
Non-decent homes About 44,000 properties, roughly 20% of stock [30]
Tenure 52% of residents in private or social rented housing [30]
Empty properties More than 8,000 identified [30]
Fuel poverty 18% of households [30]
Household growth forecast +40,000 households over 20 years [30]

The council has described the position as a housing emergency in its strategy framing. [29,30] Note that the strategy's 2,000-a-year commitment and the Local Plan's 1,974-a-year requirement are close but not identical; they come from different documents and should not be combined.

Partner / example Documented local delivery
Urban Splash / igloo JV, with Alpha Living, Regenda, TOWN and Starship / Festival Gardens Up to 800 homes; phase one 440 including 80 extra care and 110 affordable. Pre-application. [12]
Peel Waters / Central Docks Up to 2,350 homes with outline consent; £81.1m infrastructure on site to spring 2028. [15]
Regenda Group / Grove Street 304 homes replacing 144 social rent properties near the Knowledge Quarter — social rent, affordable rent, private rent, Rent to Buy and outright sale. Contractor M&Y Maintenance and Construction; architects shedkm and Metropolitan Workshop. Started summer 2022, final phase completing mid-2026. Lettings split between Regenda Homes and Redwing. [31]
Your Housing Group / Anfield Partner in the £260m Anfield and Everton programme; sold its remaining Anfield Square land interests to the council for £381,000. [20]
Riverside Completed 48 new homes in Liverpool; scheme and date not verified from a primary source. [32]
Torus, Onward, Livv, Sanctuary, Great Places, Places for People, Vistry, Sage All appear on the national SAHP first-wave strategic partner list with a Liverpool City Region presence. Partner status is national and does not by itself commit grant to a Liverpool scheme. [2]

These are examples of local activity, not a complete provider list or evidence of a new SAHP award.

Delivery and the supply chain

Stage Lead organisations Specialist input
01 · Site and viability Council estates and regeneration, LCRCA, landowner (Peel, council, RP), developer, funders Land and planning advice, valuation, surveys, abnormal-cost assessment
02 · Enabling Council, LCRCA Brownfield Land Fund, Homes England BIL grant Ground investigation, remediation, ecology, civils, utilities
03 · Funding and agreement RP, developer, public funder, lender Legal, cost advice, programme and development finance
04 · Design and consent Client team, architect, Liverpool City Council as LPA (or the MDC, if established, in the North Docks) Architecture, engineering, technical coordination
05 · Construction Main contractor and client delivery team Groundworks, structure, roofing, M&E, site services
06 · Handover and operation RP asset team, council or other operator Commissioning, landscaping, compliance, maintenance

Finding the actual route to work

Liverpool City Council publishes all tender opportunities of £25,000 and over on the Proactis ProContract portal (https://procontract.due-north.com), selecting "Liverpool City Council" from the organisation list. The North West's The Chest appears within ProContract as a portal, and the council's register of awarded contracts is reached the same way. Above-threshold notices also go to Find a Tender. [33,34]

The council publishes a Sustainable Procurement Strategy and applies social value in evaluation; specific weightings are set contract by contract. [33]

On the large programmes the counterparty is often not the council: at Central Docks it is Peel Waters and GRAHAM; at Festival Gardens it will be the Urban Splash / igloo joint venture and its sub-developers; in Pumpfields it is the individual site promoters. A funding announcement does not itself create an open invitation to tender.

Skills and delivery capacity

The City of Liverpool College is the main construction provider. Its Construction Academy at Liverpool Waters, on Regent Road, opened to its first cohort with capacity for around 250 students, working alongside the college's Vauxhall Road centre. The academy sits on the regeneration site it trains people for, with practical workshops and four purpose-built modular classrooms. [35]

Construction provision also runs from the college's Vauxhall Road and Duke Street sites: brickwork, plastering, joinery, building services, electrical and gas installation, plus apprenticeships. [36]

Regionally, the North-West Construction Technical Excellence College — one of ten in England, £100m nationally, a target of 40,000 skilled workers by 2029 — is hosted by Wigan & Leigh College and covers Liverpool City Region through its hub structure. The Combined Authority's Construction Skills Service, Skills Bootcamps and Careers Hub are the regional recruitment and upskilling routes. See the regions page.

Agree early What to record
Demand and timing Map labour needs to the programme
Employer and supervision Employing organisation, site supervisor, training partner
Learning and progression Qualification, practical experience, route into continuing work
Evidence of delivery How starts, completions and outcomes are recorded by the contract owner

Public contacts

Enquiry Public route
National grant / finance enquiries@homesengland.gov.uk
Regional brownfield / land brownfield@liverpoolcityregion-ca.gov.uk (see regions page)
Combined Authority general ask@liverpoolcityregion-ca.gov.uk · 0300 131 2881
Liverpool City Council general 0151 233 3000 · https://liverpool.gov.uk [4]
Local Plan and planning policy https://liverpool.gov.uk/planning-and-building-control/plan-making-in-liverpool/ [7]
Pride in Place PrideInPlace@liverpool.gov.uk (neighbourhood name in the subject line) [9]
Housing strategy and policy https://liverpool.gov.uk/council/strategies-and-policies/neighbourhoods-and-housing [29]
Tenders and contracts https://liverpool.gov.uk/business/tenders-and-procurement/ · Proactis ProContract [33,34]
Construction skills The City of Liverpool College · https://liv-coll.ac.uk [36]

A useful first enquiry names the site, landowner, proposed use, delivery lead, funding gap and next decision.

Sources

Research checked on 19 September 2026.

  1. Homes England / National Housing Bank, Investment Prospectus 2026 · source
  2. Homes England / MHCLG, SAHP first-wave strategic partners, 25 August 2026 · source
  3. LCRCA, Integrated settlement · source
  4. Liverpool City Council · source
  5. LCRCA, "Plan to build more than 63,000 homes in Liverpool City Region" (LCR Housing Pipeline, January 2026) · source
  6. Liverpool City Council, Local Plan supplementary documents and guidance (Pumpfields & Limekilns SPD; Housing Design Guide SPD) · source
  7. Liverpool City Council, Plan-making in Liverpool / Local Plan · source
  8. LCRCA, "Next steps confirmed for Liverpool's Mayoral Development Corporation" · source
  9. Liverpool City Council, Pride in Place — about, neighbourhood boards, plans and timescales · source · source · source
  10. Homes England, SAHP 2026–2036: strategic priorities in established mayoral strategic authority areas · source
  11. Liverpool Express, "Liverpool's new Local Plan paves the way for more than 33,500 homes", 20 July 2026 · source
  12. Liverpool Express, "Details revealed for flagship housing scheme at Festival Gardens", 9 September 2025 · source
  13. MHCLG, Pride in Place Impact Fund grant determinations 2025 to 2026 (Liverpool £750,000; determination 29 September 2025) · source
  14. MHCLG, Pride in Place Impact Fund grant determinations 2026 to 2027 (Liverpool £750,000; determination 8 April 2026) · source
  15. Liverpool Waters, "Work starts on Central Docks, Liverpool Waters" · source
  16. Liverpool Express, "Exciting future outlined for city's Pumpfields & Limekilns neighbourhood" (Cabinet 24 February 2026) · source
  17. Place North West, "Liverpool adopts housing design guide, Pumpfields masterplan" (SPDs adopted 2 June 2026) · source
  18. Insider Media, "Planning submitted for ten-storey resi scheme in Liverpool's Pumpfields area" · source
  19. Liverpool Express, "Two new proposals could provide more than 400 homes across Liverpool" (Cabinet 24 February 2026) · source
  20. Place North West, "Liverpool ramps up Anfield Square redevelopment with acquisitions" · source
  21. Liverpool Express, "Decision-making in local hands: Speke East names Pride in Place Chair", 14 April 2026 · source
  22. Liverpool Express, "Chair of Norris Green East Pride in Place Board appointed", 19 May 2026 · source
  23. Liverpool City Council jobs, "Independent Board Chair – Pride in Place Programme (Everton East)", posted 12 April 2026 · source
  24. MHCLG, Pride in Place programme delivery guidance · source
  25. MHCLG, Pride in Place programme prospectus · source
  26. MHCLG, Pride in Place Impact Fund FAQ · source
  27. House of Commons Library, "Local growth funds", research briefing CBP-9460, 12 June 2026 · source
  28. Liverpool City Council, Local Neighbourhood Fund · source
  29. Liverpool City Council, Housing Strategy 2025–2030 and High Level Delivery Plan 2025–2030, published 20 January 2025 · source
  30. Liverpool Express, "Liverpool City Council sets out housing vision to 2030", 24 May 2024 · source
  31. The Regenda Group, "Regenda Group bringing 304 new homes to Liverpool" · source
  32. Housing Digital, "Riverside completes 48 new homes in Liverpool" · source
  33. Liverpool City Council, Tenders and procurement · source ; Tender opportunities (the page that names the Proactis ProContract portal and the "Select Liverpool City Council from the organisation list" step) · source
  34. Liverpool City Council, Current tenders and contracts register · source · source
  35. Liverpool Waters, "The City of Liverpool College's new Construction Academy at Liverpool Waters welcomes first cohort" · source
  36. The City of Liverpool College, Construction & Building courses · source
  37. Homes England / Competition and Markets Authority, "Referral of the proposed subsidy to Liverpool Waters Finance Limited and Peel L&P Developments Limited for Liverpool Central Docks by Homes England" — subsidy of £55.28m, referred 27 November 2024, final report 14 January 2025; 2,350 homes across 10 hectares; funding available November 2024 to March 2027 · source
  38. Urban Splash, "First images and details revealed for flagship housing scheme at Festival Gardens", 9 September 2025 (developer's own announcement) · source ; project page · source
  39. Place North West, "Liverpool explores meanwhile use for vacant Anfield plot", 3 October 2024 · source
  40. Place North West, "Liverpool kicks off Anfield Square regeneration", 17 January 2023 (JLL, LDA Design and SPACED appointed to write the development brief) · source
  41. Liverpool City Council jobs / Jobs Go Public, "Independent Board Chair – Pride in Place Programme (Fairfield West and Newsham Park)", posted 18 March 2026, closed 7 April 2026 · source · source
  42. Peel Waters, Liverpool Waters portfolio page (Central Docks: up to 2,350 homes, largest of the five neighbourhoods) · source
  43. MHCLG, "Historic council housebuilding comeback to help families into secure homes", 24 August 2026 — regional funding breakdown of estimated first-wave SAHP Strategic Partnership spend and homes by established mayoral strategic authority: Greater Manchester £529m / c.4,400 homes; West Midlands £409m / c.3,200 homes; North East £445m / c.3,400 homes; West Yorkshire £441m / c.4,000 homes; Liverpool City Region £380m / c.3,100 homes; South Yorkshire £249m / c.2,200 homes · source

Regional sources (Combined Authority, integrated settlement, Brownfield Land Fund, SDS, MDC consultation, regional skills and procurement) are listed in regions/liverpool-city-region.md.

Research notes

Verified against primary or first-party sources

  • Liverpool's Pride in Place neighbourhoods (Everton East, Fairfield West & Newsham Park, Norris Green East, Speke East), the ten-year £20m-per-neighbourhood structure, and the programme timetable — council pages. [9]
  • Pride in Place Impact Fund: Liverpool named in both MHCLG grant determinations, £750,000 each, determined 29 September 2025 and 8 April 2026. [13,14]
  • Pumpfields & Limekilns SPD adopted 2 June 2026 alongside a Housing Design Guide SPD; Cabinet approved the masterplan for consultation on 24 February 2026; around 7,000 homes. [16,17]
  • Central Docks, Liverpool Waters: £81.1m package, £71m GRAHAM civils contract, £55.2m Homes England Brownfield Infrastructure and Land grant with Liverpool City Council as accountable body, £25.9m Peel Waters, up to 2,350 homes, completion of infrastructure and Central Park late spring 2028. [15]
  • Festival Gardens: Urban Splash / igloo JV selected, 440 homes in phase one (80 extra care, 110 affordable), up to 800 in total, remediation by VINCI completed summer 2023 at c.£53m, planning late 2026, build spring 2027. [12]
  • Local Plan approved for submission 20 July 2026: minimum 33,552 homes to 2043, 145 site allocations, five named regeneration focus areas. [11]
  • Housing Strategy 2025–2030 and its delivery plan exist and were published 20 January 2025. [29]
  • Liverpool City Council procurement runs on Proactis ProContract, all opportunities £25,000 and over, with the awarded-contracts register on the same platform; The Chest appears as a portal within ProContract. [33,34]
  • The City of Liverpool College Construction Academy at Liverpool Waters, Regent Road, c.250 students. [35]

Open / not verified

  • Festival Gardens: whether the development agreement with the Urban Splash / igloo JV has been executed. The council report seeking approval dates from September 2025; no later decision record was retrieved.
  • Everton East and Fairfield West & Newsham Park Pride in Place chairs. Adverts were posted 12 April 2026 (Everton East) and 18 March 2026, closing 7 April 2026 (Fairfield West & Newsham Park); both vacancies have closed and no appointment announcement has been published. Searched again on 19 September 2026 across liverpool.gov.uk/council/pride-in-place (about, neighbourhood boards, plans and timescales — all fetched, none names a chair), jobs.liverpool.gov.uk, Jobs Go Public, LG Jobs and Liverpool Express. [23,41]
  • How Liverpool will distribute its £1.5m Pride in Place Impact Fund. No target wards, committee report or project call published.
  • Pumpfields area: the council's own release says about 75 acres, press coverage of the adopted SPD says about 100 acres.
  • Anfield Square: resolved that it is a leisure/entertainment/employment disposal rather than a housing site (see Verification pass 2). The £260m programme totals and the £381,000 land acquisition still come from sector press, not a committee report. [20,39,40]
  • Liverpool's share of the Liverpool City Region's £52.5m UKSPF allocation, and whether a successor programme exists for 2026/27.
  • Liverpool's own share of the region's first-wave SAHP figure. MHCLG's release of 24 August 2026 publishes £380m / c.3,100 homes as a Liverpool City Region regional estimate — a regional estimate, not a borough award — but does not break this down to Liverpool itself; see the regions page. [43]
  • Current housing register and temporary accommodation numbers. Nothing recent published on the council site; the 2024 strategy figures are the most recent found.
  • Riverside's 48-home Liverpool completion: trade press only, no scheme name or date confirmed. [32]
  • Local Plan affordable housing policy wording (20%, half social rent) is press-reported; the policy text was not retrieved.
  • Ten Streets has no separately published housing number; it is being absorbed into the North Docks / Pumpfields strategic masterplan.

Verification 19 Sep 2026

  • SAHP national figure corrected. The release states only "33 partners will receive grant funding ... outside of London" and gives no grant or homes total; the partner table sums to £9,584.1m and 73,617 homes. The previously recorded "£9.996bn of grant to 33 strategic partners, 84,197 homes" was wrong and has been replaced in the programme milestones table. [2]
  • Pride in Place deadlines corrected and hardened. "Ten-year plans due winter 2026 to early 2027" and "first substantive delivery payments spring 2027" were both too loose and, on the plan date, wrong. The MHCLG delivery guidance puts Liverpool's four neighbourhoods in the cohort of 160 phase 2 boards that "submit their Pride in Place Plans to MHCLG for assessment and approval by 30 November 2026"; boundary changes were due 17 July 2026 (previously carried as "17 July 2026 reported" — now primary); and on approval £1.36m is released in financial year 2027/28, not "spring 2027". Corrected in the dates table, the Pride in Place timetable and the local funds table. [24]
  • Pride in Place funding profile added from the same guidance: phase 2 splits 63% capital / 37% revenue; £150,000 early revenue in 2025/26; £135,000 revenue plus £117,604 capital in 2026/27; £138,462 second revenue payment on approval of Chair, board membership and boundary. The press-reported £450,000 January 2026 capacity figure does not match this profile and stays marked not verified. [24]
  • Neighbourhood names re-confirmed against the primary list. MHCLG's phase 2 place-selection note reads "Liverpool | 4 | Speke East; Everton East; Norris Green East; Fairfield West & Newsham Park" — exactly as carried here.
  • Impact Fund re-confirmed against the determinations themselves: Liverpool at £750,000 in Annex A of the 2025–26 determination (signed 29 September 2025) and £750,000 in the 2026–27 determination (signed 8 April 2026), £1.5m in total. [13,14]
  • Procurement citation upgraded. The ProContract claim is now cited to the council page that actually carries it (/business/procurement-and-contracts/tender-opportunities/, HTTP 200), which names the "Proactis ProContract procurement portal" and the "Select Liverpool City Council from the organisation list" step. This brief was already correct that Liverpool uses ProContract rather than the Chest portal — the regional page's "all six councils use The Chest" line was the one that needed correcting. [33]
  • Everton East and Fairfield West & Newsham Park chairs remain not verified; a further search on 19 September 2026 found the Everton East advert of 12 April 2026 but no appointment announcement.

Verification pass 2, 19 Sep 2026

  • Central Docks grant figure made exact and upgraded to primary. "£55.2m Homes England Brownfield Infrastructure and Land grant" is now £55.28m, taken from the CMA's subsidy-control referral of 27 November 2024 (final report 14 January 2025). The referral also names the actual recipients — Liverpool Waters Finance Limited and Peel L&P Developments Limited — the funding window (November 2024 to March 2027), the eligible works, and confirms the 2,350 homes on 10 hectares. [37]
  • Liverpool Waters 2,350 homes cross-checked against the developer. Peel Waters' own portfolio page carries the "up to 2,350 homes" figure for Central Docks as the largest of the five Liverpool Waters neighbourhoods, across affordable, build-to-rent, build-to-sell and older people's tenures. Previously cited only to the Liverpool Waters news release. [42]
  • Festival Gardens numbers cross-checked against the developer. Urban Splash's own announcement of 9 September 2025 carries the same 440 phase-one homes, 80 extra care, 110 affordable, up to 800 across three phases, 34 house types, planning late 2026 and build from spring 2027. The sub-developer list is refined: TOWN works with Starship on co-housing and MMC, and the Urban Splash Residential Fund is named alongside Urban Splash and igloo. [38]
  • Anfield Square resolved. The reason no homes number is published is that it is not a residential site: the Anfield Spatial Regeneration Framework identifies it as a mixed-use opportunity and the council's stated intention is "a mix of leisure, entertainment, and employment uses", with food and beverage serving both the community and the stadium, plus meanwhile activation. JLL, LDA Design and SPACED were appointed in January 2023 to prepare the development brief; a development partner is to be selected through a later disposal process. Previously carried as an open "no homes number published" item. [39,40]
  • Fairfield West & Newsham Park chair advert located and cited, posted 18 March 2026 and closed 7 April 2026, giving this neighbourhood the same evidential standing as Everton East. Both chairs remain not verified: the council's three Pride in Place pages were all fetched on 19 September 2026 and none names a chair for any of the four neighbourhoods. [9,41]
  • Re-confirmed unchanged: the four neighbourhood names against MHCLG's phase 2 list; the Impact Fund at £750,000 in each determination; the 30 November 2026 plan deadline; Speke East (Rev Philip Saltmarsh) and Norris Green East (Ann-Marie Ferrigan) chairs.
  • Still open after a further search on 19 September 2026: execution of the Festival Gardens development agreement (searched the council's news service, Urban Splash, igloo and trade press — the September 2025 report seeking Cabinet approval remains the last published step); the £1.5m Impact Fund distribution within Liverpool; the Pumpfields 75 vs 100 acres discrepancy; Liverpool's share of the £52.5m LCR UKSPF allocation; current housing register and temporary accommodation numbers; Riverside's 48-home completion; the Local Plan affordable policy wording.
  • SAHP first-wave regional estimate resolved. MHCLG's release of 24 August 2026, "Historic council housebuilding comeback to help families into secure homes," publishes a regional funding breakdown giving Liverpool City Region an estimated £380m and around 3,100 homes. This is MHCLG's own published regional estimate, not press or council-sourced, and the "not verified" marking on it is removed; it remains a regional estimate, not a Liverpool award, and is not broken down to Liverpool itself. [43]

Blocked or missing URLs

  • https://liverpool.gov.uk/business/tenders-and-procurement/tender-opportunities/ — HTTP 404.
  • https://liverpool.gov.uk/business/selling-to-the-council/ — HTTP 404 (checked 19 September 2026). The working procurement pages are /business/tenders-and-procurement/, /business/procurement-and-contracts/tender-opportunities/, /business/tenders-and-procurement/current-tenders and /business/tenders-and-procurement/contracts-register, all HTTP 200. The working pages are /current-tenders and /contracts-register. [34]
  • Liverpool City Council's committee management system was not used for this edition; Cabinet reports of 24 February 2026 (small sites, empty homes, Pumpfields masterplan) are cited from the council's own news service rather than the report packs.

General information only, not legal, financial or professional advice. Confirm eligibility and terms with the relevant body.