Funding, places and delivery. A briefing for the organisations bringing forward homes and regeneration across Sandwell's six towns.

Dates and decisions to watch
| As at 19 September 2026 | Published position |
|---|---|
| Friar Park Pride in Place (phase 2) | Governance model approved by Cabinet 14 January 2026; Chair Jonathan Ward announced. The binding date is the government's: 30 November 2026. Sandwell's Cabinet paper works to 28 November 2026, two days earlier — an internal submission target ahead of the national deadline, not a different deadline. Work to 28 November; the Plan must be with MHCLG by 30 November. [3,6,29,32] |
| Tividale Pride in Place (phase 2 expansion) | Sandwell's third Pride in Place place, previously missing from this brief. Named on MHCLG's phase 2 expansion list published 20 March 2026; £20m over ten years. Tividale Neighbourhood Board constituted, chaired by Peter Hayward (volunteer at Oakham Church), first meeting 15 July 2026; board meets four to five times a year. Regeneration Plan and four-year Investment Plan due to government by 26 February 2027, stated in the board's own papers as well as the national guidance. Board contact: town_deal@sandwell.gov.uk. [32,33] |
| Smethwick Pride in Place (phase 1) | Confirmed on MHCLG's phase 1 place-selection methodology note ("West Midlands | Sandwell | Smethwick"). 10-year Regeneration Plan and 4-year Investment Plan submitted late 2025; government approval and first funding by April 2026; local funding programme opened to community groups 1 July 2026. Phase 1 places carry no plan deadline in the current national timeline. [4,5,7,34] |
| Pride in Place Impact Fund | £750,000 for 2025/26 (determined 29 September 2025) and £750,000 for 2026/27 (determined 8 April 2026); national guidance requires commitment by 31 March 2027. No Sandwell target wards published. [27,28,29] |
| Friar Park Urban Village | Keepmoat appointed preferred developer, September 2025; around 600 homes; decontamination planning expected to take two to three years before house building starts. [9,10] |
| Sandwell Local Plan | Submitted December 2024; main modifications consulted on 16 February–30 March 2026; adoption anticipated summer 2026. Local Plan 2 (2026–2044) separately instructed by government, no target yet published. [14,15] |
Figures in this briefing cover different programmes, geographies and periods. They should not be added into a single borough investment total.
The funding landscape
Up to £46 billion over ten years
Homes England and its subsidiary, the National Housing Bank, have up to £46 billion to deploy across England to 2036. These are the principal streams. [1]
The joint Investment Prospectus, published on 31 March 2026 ahead of the Bank's opening on 1 April, brings grant, land and finance into one framework. The Bank aims to attract more than £50 billion of additional private capital over the decade.
| Stream | Amount | What it funds / who it reaches |
|---|---|---|
| Social and Affordable Homes Programme 2026–2036 | At least £27bn outside London; £39bn nationally, including London | Capital grant for social and affordable rent, shared ownership, supported housing and estate regeneration. Registered Providers, councils, housebuilders and community-led organisations, through continuous market engagement or strategic partnerships. |
| Housing and Infrastructure Capital Grant | About £3.1bn (Homes England's share of the £5bn national pot*) | Land assembly, remediation and strategic infrastructure; dedicated viability-gap support planned for later in 2026/27. Councils, developers and landowners with sites the market cannot unlock alone. |
| National Housing Delivery Fund (debt, equity and guarantees) | Up to £16bn | Loans, equity and guarantees, including funding that may be devolved to mayoral authorities. Housebuilders, Registered Providers, funds and lending partners. |
*The prospectus describes the agency's share as £3.1bn, subject to final confirmation. These are programme envelopes, not a ring-fenced allocation to Sandwell.
Programme milestones
| Date | Milestone |
|---|---|
| 31 March / 1 April 2026 | Investment Prospectus published / National Housing Bank opens |
| 24 August 2026 | MHCLG publishes a regional funding breakdown estimating the West Midlands' first-wave Strategic Partnership spend at £409m / c.3,200 homes — a regional estimate, not a Sandwell award [36] |
| 25 August 2026 | First wave: 33 strategic partners confirmed outside London. The Homes England release states no grant or homes total; its partner table sums to £9,584.1m and 73,617 homes, each partner capped at £350.0m. No West Midlands or Sandwell figure is given in that release [2] |
| Later in 2026/27 | Dedicated viability-gap grant planned [1] |
| To 2036 | Ten-year programme period |
Grant, land and finance (products and routes)
Which support fits a scheme depends less on its size than on what is holding it up: a funding gap, a difficult site, or the tenure of the homes to be delivered. [1]
| Family | Product | Purpose | Typical user |
|---|---|---|---|
| Grant | Social and Affordable Homes Programme | Affordable tenures, supported housing and estate regeneration | RPs, councils, developer partners |
| Grant | Housing and Infrastructure Capital Grant | Viability gaps, infrastructure, land assembly and remediation | Councils, landowners, master developers |
| Land | Homes England land | Acquisition, enabling and disposal through sale, lease, development agreement or joint venture | Developers of all sizes |
| Finance | SME Accelerator Loan | Site finance for smaller builders establishing a track record | SME housebuilders |
| Finance | Revolving credit facility | Multi-site support alongside commercial lenders | Growing builders |
| Finance | Senior and mezzanine debt | Project funding for build to rent, later living and brownfield schemes | Developers and funds |
| Finance | Corporate lending | Balance-sheet finance for growth, including modern methods of construction | Housebuilders |
| Finance | Infrastructure loans | Long-term finance, up to 15 years, for upfront infrastructure | Developers and councils |
| Finance | Low-interest RP loans | Unlocking capital investment in social and affordable homes | Registered Providers |
| Finance | Equity | Minority investment in vehicles typically delivering more than 3,000 homes | Funds and partnerships |
| Finance | Guarantees | Bonds and loans to reduce institutional financing costs | Funds and RPs |
Two grant routes in the West Midlands. Land, remediation and infrastructure money is normally expected to come first through WMCA's integrated settlement and devolved housing and land funds. Social and Affordable Homes Programme grant remains administered by Homes England, with WMCA's mayoral strategic priorities shaping bids in the seven boroughs. The National Housing Bank makes its own finance decisions while working alongside the agency. [1,18,21]
Sandwell's own recent experience shows both routes in use: WMCA's Brownfield Fund clean-up money for Friar Park, and Homes England / Homes England-adjacent Levelling Up Fund site acquisition for Smethwick. [9,13]
Regional routes: West Midlands
Regional routes: see regions/west-midlands.md for the Combined Authority's devolved housing and land funds, the integrated settlement, the Spatial Development Strategy, the Birmingham East Mayoral Development Corporation, the SAHP first-wave regional estimate (MHCLG's published £409m / c.3,200 homes) and the regional skills offer.
For a Sandwell scheme, the first conversation depends on the funding gap. A regional headline figure is not a borough award.
| Scheme requirement | Route to establish (Sandwell) | What to resolve |
|---|---|---|
| Social and affordable homes | Homes England's SAHP 2026–2036, through strategic partnership or continuous market engagement, shaped by WMCA's published strategic priorities. | Tenure mix against the mayor's c.60% Social Rent priority, delivery partner, grant requirement and timing. [18,21] |
| Land, infrastructure or abnormal costs | Sandwell Metropolitan Borough Council with WMCA's devolved housing and land funds and the integrated settlement. | Why the site cannot proceed, what intervention unlocks it, and the regional strategic case. Friar Park's decontamination was unlocked this way. [9] |
| Additional affordable-housing support | WMCA's Single Commissioning Framework, invest@wmca.org.uk. | SAHP should be secured or actively progressing; explain the remaining gap and deliverability. [3] |
| Debt, equity or guarantees | National Housing Bank via Homes England. | Borrower or investment structure, commercial funding, security and the route to repayment. [1] |
Who decides what (decisions and public contacts)
- Homes England / National Housing Bank — Final SAHP funding and contractual decisions; the Bank assesses its finance investments. [1,18]
- West Midlands Combined Authority — Regional priorities, tenure mix and priority corridors; devolved housing and land funds; Single Commissioning Framework. [3,21]
- Sandwell Metropolitan Borough Council — Local housing need, planning authority, council land; accountable body for both Pride in Place programmes and the Impact Fund. [3,4,27,28]
- Friar Park Pride in Place Neighbourhood Board (phase 2) — Being constituted; will produce the 10-year Regeneration Plan for Friar Park, Wednesbury. [3]
- Smethwick Partnership Board (phase 1) — Governs the Smethwick Pride in Place programme; submitted the 10-year Regeneration Plan and 4-year Investment Plan to government in late 2025. [4,5]
- Development partners under contract — Keepmoat at Friar Park; GreenSquareAccord and Morro Partnerships at Swan Lane. These are existing appointments, not open opportunities. [9,11]
Public routes for the next conversation
| Enquiry | Public route |
|---|---|
| National grant / finance | enquiries@homesengland.gov.uk [1] |
| WMCA investment pre-application | invest@wmca.org.uk [3] |
| Sandwell regeneration and growth | think_sandwell@sandwell.gov.uk [25] |
| Sandwell housing | Housing_Hub@sandwell.gov.uk [25] |
| Local Plan / planning policy | Sandwell_LocalPlan@sandwell.gov.uk · 0121 569 7474 [14] |
| Procurement (In-tend support) | 0844 272 8810 · in-tendhost.co.uk/sandwellmbc [22] |
| Friar Park Pride in Place | Regenerating Sandwell, Friar Park programme page [6] |
| Smethwick Pride in Place | Smethwick-LTP pages, Sandwell Council website [4] |
A useful first enquiry names the site, landowner, proposed use, delivery lead, funding gap and next decision.
Accessing programme grant: a route for smaller providers
- Continuous Market Engagement — Open for individual schemes and portfolios while funding remains available. Designed to accommodate smaller partners, new entrants and complex projects. [19]
- Strategic partnerships — Programme-level allocations. The initial bidding round closed on 15 April 2026; future rounds will be announced. [18]
| Route | Practical fit and requirements |
|---|---|
| CME general | A direct scheme bid. Establish eligible tenure, costs, delivery readiness and grant need with Homes England. [18,19] |
| CME portfolio | Initial portfolios normally deliver 300–500 homes; named sites should start by 31 March 2028 and complete by 31 March 2032. [19] |
| Delivery partnership | An eligible RP or council can work with a strategic partner under the programme's delivery-partner rules. [18,20] |
Before a grant application
Organisations need Homes England Investment Partner qualification to receive grant. WMCA's mayoral strategic priorities seek approximately 60% Social Rent through SAHP bids in the seven boroughs. [21] The Friar Park Urban Village scheme is designed to at least 25% affordable homes; the earlier, superseded WMCA Brownfield Fund tranche for the same site required a minimum 20% affordable homes under WMCA's own standard — a lower, older figure that should not be quoted as the current requirement. [9,26]

Places and programmes (borough programmes)
Friar Park Urban Village, Wednesbury — around 600 homes, Keepmoat appointed
The largest live housing site in the borough: a roughly 32-football-pitch former waste plant, foundry and hospital site that has sat derelict for over 40 years. Sandwell Council and WMCA appointed Keepmoat, a top-10 national housebuilder, as preferred developer in September 2025 to bring forward around 600 homes, at least 25% of them affordable. [9,10]
Before house building starts, the partners must secure planning permission for a major land decontamination programme; that process is expected to take two to three years, with the full development spanning eight to ten years. [10]
An earlier WMCA Brownfield Fund announcement described the same site as a "750-home community" under a 20%-affordable condition. That figure is five years old, comes from an earlier phase of WMCA funding, and is superseded by the 600-home, 25%-affordable scheme now in delivery with Keepmoat. Do not add the two figures together; treat 600 as the current position. [9,26]
Friar Park is also the borough's Pride in Place phase 2 neighbourhood, discussed below. [3]
Swan Lane, West Bromwich — 147 affordable homes, GreenSquareAccord
A former gas works site delivering 147 new homes for social and affordable rent: 41 two-bed and 24 three-bed houses, plus 17 one-bed and 65 two-bed apartments. Delivery partner is GreenSquareAccord with developer Morro Partnerships, in a scheme involving Sandwell Council and Homes England. The Black Lake Metro stop is less than 100 metres away. GreenSquareAccord's own reporting frames Swan Lane as delivering the RP's 2,000th affordable home through the Matrix Partnership route with Homes England. Completion is phased; exact overall completion date not verified. [11]
West Bromwich town centre masterplan — 1,359 homes envisaged over 20 years
WMCA's Midlands Investment Portfolio describes a 22-hectare masterplan generating 1,359 new homes alongside a new Metro gateway, Town Square, 12,000 sq m of new retail floorspace and 1,740 jobs, with an indicative delivery period of April 2026 to March 2042 and £165m of associated investment. This is a long-term masterplan envelope rather than a single consented scheme, and should be read as an ambition figure, not a committed homes number with a delivery date. [12]
Smethwick — Levelling Up Fund site acquisition, around 151 homes
Sandwell was awarded just over £18m from Round 3 of the Levelling Up Fund. Together with match funding, this is being used to acquire sites in Smethwick and bring forward development-ready land for around 151 new homes and a new primary school. This is assembly and site-preparation funding, not a homes grant; the eventual developer and tenure mix are not verified here. [13]

Pride in Place: three places, three cohorts, three clocks
Sandwell has one place in each of the programme's three national cohorts, and the previous edition of this brief carried only two of them. All three are confirmed against the relevant primary MHCLG place list: Smethwick (phase 1, plan already submitted and approved), Friar Park, Wednesbury (phase 2, plan due 30 November 2026) and Tividale (phase 2 expansion, named 20 March 2026, plan due 26 February 2027). They are at different stages and should not be approached in the same way, and the three £20m awards must never be summed. [3,4,32,33,34]
| Neighbourhood | Published position / next conversation |
|---|---|
| Friar Park, Wednesbury (phase 2) | Up to £20m over 10 years, including £7.17m as revenue funding. Capacity funding of £150,000 was released in 2025/26 to support board formation and community engagement. Cabinet approved the governance model on 14 January 2026; Jonathan Ward, Deputy Director of the Albion Foundation and a Friar Park resident, was announced as Independent Chair. The council's own Cabinet timescale gives 28 November 2026 for submission of the Regeneration Plan, with a first delivery-funding payment in April 2026, Neighbourhood Board membership and boundary confirmation by July 2026, and MHCLG review that autumn. Investment runs in three periods to 2035/36. On the 28 vs 30 November question: the delivery guidance's 30 November 2026 is the deadline by which MHCLG must have the Plan; Sandwell's Cabinet paper's 28 November 2026 is the council's own internal submission target two days ahead of it. They are not competing deadlines — work to 28 November and treat 30 November as the point of no return. [3,6,29] |
| Tividale (phase 2 expansion) | £20m over ten years. Named on MHCLG's phase 2 expansion place-selection methodology note published 20 March 2026 ("Sandwell | 1 | Tividale"), one of 40 neighbourhoods added that day. The Tividale Neighbourhood Board held its first meeting on 15 July 2026, chaired by Peter Hayward, a volunteer at Oakham Church, with a wide stakeholder membership; it meets four to five times a year and its own papers record the deadline for submission of the Regeneration Plan and four-year Investment Plan as 26 February 2027, with a revised boundary deadline of 28 August 2026. First business included Terms of Reference, board name and branding, a draft financial plan and an engagement plan. Board contact: town_deal@sandwell.gov.uk. [32,33] |
| Smethwick (phase 1) | Up to £20m over 10 years. Originally the 2023 Long-Term Plan for Towns, relaunched as Plan for Neighbourhoods in March 2025 and renamed Pride in Place in September 2025. The 10-year Regeneration Plan and 4-year Investment Plan were submitted to government on 28 November 2025 — the earlier "December 2025" reading was wrong; government approval followed in April 2026, and the Smethwick Pride in Place funding programme opened to local groups on 1 July 2026, with grants from £500 up to £25,000 in Year 1. Governing body: the Smethwick Partnership Board, chaired by Alan Taylor, Sandwell Business Ambassador and business representative of MI Glass, Smethwick, with Jude Thompson (CSCM Limited) as Vice-Chair — read from the Board's own 5 February 2026 public reports pack. The Board has since agreed an updated 10-year Regeneration Plan responding to government feedback (March 2026). [4,5,7,35] |
Sandwell's Cabinet report records that Sandwell is one of 95 places identified nationally for the separate Pride in Place Impact Fund. Reading MHCLG's own Annex A directly, each determination lists 94 local authorities — 93 at £750,000 and one at £1,500,000, totalling £71.25m a year. The council's "95 places" and the determination's "94 authorities" are counting different things (places against accountable bodies) and neither is the 284-place Pride in Place Programme cohort. [3,27,28]
Why Wednesbury needed a new board
Wednesbury already has a Levelling Up Partnership (LUP) board. The council considered using it for Pride in Place and rejected that option: the LUP board's membership does not reflect people with a deep-rooted connection to the smaller Friar Park neighbourhood area, which is defined by a Middle Layer Super Output Area of 5,000–15,000 residents, not the whole of Wednesbury. [3]
Bring a project that can be delivered
- Need, ownership and consent — Who benefits, land control, delivery lead, consents and dependencies.
- Capital and continuing costs — Works, contingency, asset owner, operating budget and maintenance.
National guidance requires each Neighbourhood Board to have at least eight members, including the local MP and at least one ward councillor, with a majority living or working locally. [29,30]
Pride in Place Impact Fund — £1.5m over two years
- £750,000 in 2025/26 (determination 29 September 2025) and £750,000 in 2026/27 (determination 8 April 2026), read directly from the two GOV.UK determinations. [27,28]
- Sandwell's own Cabinet paper describes this as a separate strand from the Programme, subject to a future Cabinet report on how it will be spent; no target wards or project list is published as at 19 September 2026. Not verified: which neighbourhoods or projects the Impact Fund will support. [3]
- National guidance requires commitment by 31 March 2027. [29]
Local investment and project calls: different pots, different decisions
| Fund | Amount | Latest published position |
|---|---|---|
| Pride in Place, Friar Park (phase 2) | Up to £20m over 10 years, incl. £7.17m revenue | Governance approved 14 Jan 2026; Chair Jonathan Ward; Plan due (per Cabinet) 28 Nov 2026. [3] |
| Pride in Place, Tividale (phase 2 expansion) | Up to £20m over 10 years | Named 20 March 2026; Board first met 15 July 2026, Chair Peter Hayward; Regeneration Plan and four-year Investment Plan due 26 February 2027. [32,33] |
| Pride in Place, Smethwick (phase 1) | Up to £20m over 10 years | Plan submitted late 2025; approved April 2026; funding programme opened 1 July 2026. [4,5] |
| Pride in Place Impact Fund | £1.5m (£750,000 in 2025/26, £750,000 in 2026/27) | Determinations of 29 September 2025 and 8 April 2026. Borough-wide; no target wards published. [27,28] |
| Levelling Up Fund Round 3 | Just over £18m | Smethwick site acquisition for around 151 homes and a new primary school. [13] |
| Towns Fund | £67.5m total, reported as the largest of any local authority area | Programme across Sandwell's six towns; individual scheme reporting not researched fresh for this edition. [31] |
| WMCA Brownfield Fund (2018 Housing Deal) | Regional £100m fund; Friar Park cited as flagship site | Decontamination and site clean-up at Friar Park; superseded 750-home/20%-affordable figure. [9,26] |
| UKSPF successor | not verified | No Sandwell-specific 2026/27 UKSPF successor allocation or open call found; in the West Midlands this money increasingly sits inside WMCA's integrated settlement. See regions/west-midlands.md. |
Do not add these figures together. They are different programmes, geographies and periods, and some of them fund overlapping sites (Friar Park appears under both the Pride in Place Programme and the WMCA Brownfield Fund).

Homes, partners and local need
What the evidence base says
The Housing Needs Assessment 2025, presented to Sandwell's Scrutiny Board, records that the number of households on the housing register has almost doubled since the previous 2022 assessment: [16]
| Measure | Figure |
|---|---|
| Households on the housing register, March 2025 | 20,423 (up from 10,591 in 2022) |
| Households requiring a one-bedroom property | 52% of the register |
| Single-person households | 8,267 (the largest household type) |
| Households in Band 5 (lowest published priority) | 15,389 (75% of the register) |
| Households in a priority band (1–4) | 25%, mostly Band 3 (14%) |
| Households on the register stated as homeless | 330 |
| Households requiring an adapted property | 276 |
The Housing Strategy 2023–2028 sets a target of 100–150 new council homes a year through 2028, alongside priorities on affordable supply, best use of existing stock, housing quality, health and fuel poverty. [17]
The statutory position
The submitted Sandwell Local Plan, covering the period to 2041, was submitted to the Secretary of State on 11 December 2024. Examination hearings ran in July and September 2025; the Inspector recommended main modifications, consulted on from 16 February to 30 March 2026. Formal adoption is anticipated summer 2026, delayed partly by Planning Inspectorate resourcing. A specific borough-wide annual housing number from this plan was not verified in this edition. [14]
Separately, government has instructed Sandwell — one of around 40 councils — to begin work on a new-style Sandwell Local Plan 2 (2026–2044) as part of national planning reform, to be prepared "in no more than three years." No housing target figures for Local Plan 2 are yet published. The two plans should not be confused: Local Plan 2 does not replace the plan awaiting adoption; it starts once the current plan is adopted. [15]
Delivery and the supply chain
| Stage | Lead organisations | Specialist input |
|---|---|---|
| 01 · Site and viability | Council estates and regeneration, landowner, developer, RP, funders | Land and planning advice, valuation, surveys, abnormal-cost assessment |
| 02 · Enabling | Council, developer, Homes England / WMCA | Ground investigation, remediation, ecology, civils, utilities |
| 03 · Funding and agreement | RP, developer, public funder, lender | Legal, cost advice, programme and development finance |
| 04 · Design and consent | Client team, architect, Sandwell planning authority | Architecture, engineering, technical coordination |
| 05 · Construction | Main contractor and client delivery team | Groundworks, structure, roofing, M&E, site services |
| 06 · Handover and operation | RP asset team, council or other operator | Commissioning, landscaping, compliance, maintenance |
Finding the actual route to work
Sandwell Metropolitan Borough Council runs its own In-tend instance, distinct from the shared Black Country Portal used by Dudley and the CSW-JETS instance shared by Coventry and Solihull. Suppliers register at in-tendhost.co.uk/sandwellmbc; the In-tend support line for portal problems is 0844 272 8810. [22]
The council publishes a Procurement Contracts Register and Contract Procedure Rules; a specific council-wide procurement threshold figure (equivalent to Birmingham's published £25,000) was not verified in this edition — confirm with the council's procurement team before assuming a figure. [22]
Above-threshold notices. Above-threshold opportunities are published nationally on Find a Tender (find-tender.service.gov.uk); below-threshold notices appear on Contracts Finder and on the council's own In-tend instance. Register on Sandwell's In-tend instance as well as watching Find a Tender: expressions of interest and tender documents are issued through the portal, not through the national services. [22]
A funding announcement does not itself create an open invitation to tender. At Friar Park the delivery partner (Keepmoat) and at Swan Lane the delivery partner (GreenSquareAccord / Morro Partnerships) are already appointed; supply-chain work on those schemes flows through those partners, not through a council tender. [9,11]
Skills and delivery capacity
Sandwell College, based in West Bromwich with sites across Birmingham and the Black Country, delivers construction courses including carpentry, joinery, painting, decorating, plastering, plumbing and tiling, alongside apprenticeships. A £9m Skills Centre in Cradley Heath was under construction and due to open in early 2026, expanding the college's construction and trades capacity. [23]
The regional West Midlands Construction Technical Excellence College is hosted by Dudley College of Technology — one of ten CTECs named in England following a 2025 Department for Education process, with delivery sites at the Construction Apprenticeship Training Centre in Brierley Hill and the Advance Centre in Dudley. Sandwell sits within Dudley College's regional remit; a Sandwell-specific construction skills hub beyond Sandwell College is not verified. See regions/west-midlands.md for the regional skills routes. [24]
| Agree early | What to record |
|---|---|
| Demand and timing | Map labour needs to the programme |
| Employer and supervision | Employing organisation, site supervisor, training partner |
| Learning and progression | Qualification, practical experience, route into continuing work |
| Evidence of delivery | How starts, completions and outcomes are recorded by the contract owner |
Sources
Research checked on 19 September 2026.
- Homes England / National Housing Bank, Investment Prospectus 2026 · source
- Homes England / MHCLG, "Homes England and government confirm strategic partners...", 25 August 2026 · source
- Sandwell MBC Cabinet, "Pride in Place Programme – Governance Model", 14 January 2026 · source
- Sandwell Council, Smethwick Pride in Place Programme · source
- Sandwell Council, "Smethwick regeneration and investment plans submitted to Government" · source
- Sandwell Council, "Chair of the Friar Park Pride in Place Neighbourhood Board announced" · source
- Sandwell Council, "Smethwick Pride in Place funding programme is now open" · source
- WMCA, "Sandwell and West Midlands Mayor appoint developer to drive forward 600 new homes in Wednesbury" · source
- Construction Enquirer, "Keepmoat to deliver new 600-home urban village in Sandwell", 1 September 2025 · source
- GreenSquareAccord, "We're delivering 147 new affordable homes in West Bromwich" · source ; project page · source
- Midlands Investment Portfolio, West Bromwich Masterplan · source
- Sandwell Council, Levelling Up Fund Round 3 · source
- Sandwell Council, Sandwell Local Plan · source
- Sandwell Council, Sandwell Local Plan 2 (2026–2044) · source
- Sandwell MBC Scrutiny Board, Housing Needs Assessment 2025: Summary of Findings · source
- Sandwell Council, Housing Strategy 2023–2028 · source
- Homes England, SAHP 2026 to 2036 guidance · source
- Homes England, SAHP Continuous Market Engagement route · source
- Homes England, SAHP Strategic Partnership route · source
- Homes England, SAHP 2026–2036: strategic priorities in established mayoral strategic authority areas · source
- Sandwell MBC electronic tendering site (In-tend) · source
- Sandwell College, "Construction starts on Sandwell College Skills Centre in Cradley Heath" · source ; construction courses · source
- Dudley College of Technology, West Midlands Construction Technical Excellence College — see
regions/west-midlands.md· source - Sandwell Council, contact pages · source · source (think_sandwell@sandwell.gov.uk and Housing_Hub@sandwell.gov.uk addresses reported in secondary sources; council contact pages are the verified route)
- WMCA, "WMCA and Sandwell Council deal unlocks biggest brownfield housing site in region" · source
- MHCLG, Pride in Place Impact Fund grant determinations 2025–26 · source
- MHCLG, Pride in Place Impact Fund grant determinations 2026–27 · source
- MHCLG, Pride in Place programme delivery guidance · source
- MHCLG, Pride in Place programme prospectus · source
- Regenerating Sandwell, Towns Fund Programme · source
- MHCLG, Pride in Place Programme phase 2 expansion: place selection methodology note, published 20 March 2026 ("Sandwell | 1 | Tividale") · source ; MHCLG, "Local people take the lead in 40 more communities", 20 March 2026 · source
- Sandwell MBC, Tividale Neighbourhood Board, public reports pack, 15 July 2026 (Chair Peter Hayward; Terms of Reference; 26 February 2027 Regeneration Plan deadline; town_deal@sandwell.gov.uk) · source
- MHCLG, Pride in Place Programme phase 1: place selection methodology note ("West Midlands | Sandwell | Smethwick") · source
- Sandwell MBC, Smethwick Partnership Board, public reports pack, 5 February 2026 (Chair Alan Taylor, MI Glass; Vice-Chair Jude Thompson, CSCM Limited; 28 November 2025 submission; updated Regeneration Plan responding to government feedback) · source ; Smethwick Partnership Board committee details · source
- MHCLG, "Historic council housebuilding comeback to help families into secure homes", 24 August 2026 — regional funding breakdown of estimated first-wave SAHP Strategic Partnership spend and homes by established mayoral strategic authority: Greater Manchester £529m / c.4,400 homes; West Midlands £409m / c.3,200 homes; North East £445m / c.3,400 homes; West Yorkshire £441m / c.4,000 homes; Liverpool City Region £380m / c.3,100 homes; South Yorkshire £249m / c.2,200 homes · source
Research notes
Verified from primary or council sources
- Sandwell Cabinet's 14 January 2026 Pride in Place governance report read first-hand (PDF): Friar Park (Wednesbury) selected as the borough's phase 2 neighbourhood; up to £20m over 10 years including £7.17m revenue; £150,000 capacity funding in 2025/26; Sandwell one of 95 places nationally for the separate Impact Fund; the council's own timescale gives 28 November 2026 for Regeneration Plan submission; the Wednesbury LUP board was considered and rejected as the Neighbourhood Board. [3]
- Pride in Place Impact Fund determinations read directly from the two GOV.UK publications: £750,000 for Sandwell in 2025/26 (29 September 2025) and £750,000 in 2026/27 (8 April 2026). [27,28]
- Friar Park Urban Village: Keepmoat appointed preferred developer, September 2025, around 600 homes, at least 25% affordable, on a c.32-football-pitch former waste/foundry/hospital site; decontamination planning expected to take two to three years. [9,10]
- Swan Lane, West Bromwich: GreenSquareAccord and Morro Partnerships delivering 147 homes for social and affordable rent on a former gas works site. [11]
- Housing Needs Assessment 2025 figures read from the council's own summary of findings: 20,423 households on the register in March 2025, up from 10,591 in 2022. [16]
Open items
- No Sandwell-specific target wards or project list for the £1.5m Impact Fund is published.
- No current council-wide procurement threshold (equivalent to Birmingham's published £25,000) was found for Sandwell's own In-tend instance.
- Whether the earlier 750-home Friar Park figure (WMCA Brownfield Fund, 2021) and the current 600-home Keepmoat scheme cover exactly the same land parcel, or whether the site has been reduced, was not verified; both are reported with their dates rather than combined.
- Sandwell Local Plan 2 (2026–2044) has no published housing target figure as at 19 September 2026; its relationship to the submitted Local Plan's eventual adoption is stated by the council but the transition date is not fixed.
Blocked or failed URLs
- https://sandwell.moderngov.co.uk/mgAi.aspx?ID=9463 (New Local Plan timetable agenda item) — HTTP 403 to direct WebFetch; retrieved via ScrapingBee instead (200), full content not further parsed in this edition.
- The Cabinet PDF at https://sandwell.moderngov.co.uk/documents/s31199/Pride%20in%20Place%20Programme.pdf initially returned an unreadable compressed stream to WebFetch's summariser; retrieved as binary and read with
pdftotext -layout. - sandwell.moderngov.co.uk PDFs (Tividale Neighbourhood Board pack, Smethwick Partnership Board pack) were retrieved through ScrapingBee (HTTP 200) and read with
pdftotext -layout.
Verification 19 Sep 2026
- Sandwell has three Pride in Place places, not two. Tividale was missing entirely. Named on MHCLG's phase 2 expansion methodology note published 20 March 2026 ("Sandwell | 1 | Tividale"), £20m over ten years. Added to the dates table, the Pride in Place section and the local funds table, and the section retitled "three places, three cohorts, three clocks". [32]
- Tividale detail read from the Board's own primary papers (public reports pack, 15 July 2026): first meeting 15 July 2026; Chair Peter Hayward, volunteer at Oakham Church; board meets four to five times a year; first business Terms of Reference, board name and branding, draft financial plan and engagement plan; boundary change deadline 28 August 2026; Regeneration Plan and four-year Investment Plan due 26 February 2027; contact town_deal@sandwell.gov.uk. [33]
- The 28 vs 30 November question is resolved, not just reported. 30 November 2026 is MHCLG's deadline for the Plan to be received; Sandwell's Cabinet paper's 28 November 2026 is the council's own internal submission target two days ahead of it. They are not competing deadlines. Stated that way in both the dates table and the Friar Park entry; open item closed. [3,29]
- Smethwick Partnership Board chair confirmed from a primary source and the "not verified" removed: Alan Taylor, Sandwell Business Ambassador and business representative of MI Glass, Smethwick, with Jude Thompson (CSCM Limited) as Vice-Chair, read from the Board's 5 February 2026 public reports pack. [35]
- Smethwick submission date resolved: 28 November 2025, not December 2025. The brief previously carried both and marked the conflict unresolved. Also added that the Board has since agreed an updated 10-year Regeneration Plan responding to government feedback (March 2026). [35]
- Smethwick's phase 1 status upgraded to primary: confirmed on MHCLG's phase 1 place-selection methodology note. Friar Park's phase 2 status re-confirmed on the phase 2 note. [34]
- SAHP first-wave wording corrected in the milestones table: "£9.58bn to 33 strategic partners" implied a published total. The release states no grant or homes total; the partner table sums to £9,584.1m and 73,617 homes, each partner capped at £350.0m. [2]
- SAHP first-wave regional estimate added. MHCLG's release of 24 August 2026, "Historic council housebuilding comeback to help families into secure homes," publishes a regional funding breakdown giving the West Midlands an estimated £409m and around 3,200 homes for first-wave Strategic Partnership spend — MHCLG's own regional estimate, not a Sandwell award. [36]
- Impact Fund cohort count sharpened. The Cabinet paper's "95 places" was carried unexamined. Reading both Annex A tables directly: each determination lists 94 local authorities, 93 at £750,000 and one at £1,500,000, totalling £71.25m a year. Sandwell's own £750,000 in each year is confirmed and unchanged. [27,28]
- Procurement re-checked: Sandwell's own In-tend instance at in-tendhost.co.uk/sandwellmbc, distinct from the Black Country Portal and CSW-JETS. Unchanged; no published council-wide threshold found, which remains flagged.